ArcGIS REST Services Directory Login | Get Token
JSON

Legend (AGO/SARs_Data)

Fitting (1)
Grinder Pump Grinder Pump
Hose Bib Hose Bib
Cap Cap
Bend 11.25 Bend 11.25
Bend 22.5 Bend 22.5
Bend 45 Bend 45
Bend 90 Bend 90
Blind Flange Blind Flange
Clean Out Clean Out
Cross Cross
Custom PCCP Custom PCCP
Fire Hydrant Fire Hydrant
Other Other
Reducer Reducer
Tee Tee
Wye Wye
Manhole (2)
Valve (3)
<all other values> <all other values>
Chlorine Basin Influent Chlorine Basin Influent
Chlorine Solution Chlorine Solution
Flow Eualization Sludge Flow Eualization Sludge
Gravity Thickener Influent Gravity Thickener Influent
High Pressure Air High Pressure Air
Mixed Liquor Mixed Liquor
Nonpotable Water Nonpotable Water
Plant Drain Plant Drain
Plant Influent Plant Influent
Potable Water Potable Water
Preliminary Building Bypass Preliminary Building Bypass
Primary Clarifier Bypass Primary Clarifier Bypass
Primary Clarifier Effluenet Primary Clarifier Effluenet
Primary Clarifier Influent Primary Clarifier Influent
Primary Scum Primary Scum
Primary Sludge Primary Sludge
Raw Sewage Raw Sewage
Return Activated Sludge Return Activated Sludge
Sludge Transfer Sludge Transfer
Sulfur Dioxide Liquid Sulfur Dioxide Liquid
Thickener Scum Thickener Scum
Thickener Sludge Thickener Sludge
Thickener Supernatant Thickener Supernatant
Waste Sludge Waste Sludge
Line (4)
<all other values> <all other values>
<Null>, Storm Sewer <Null>, Storm Sewer
<Null>, <Null> <Null>, <Null>
84", Raw Sewage 84", Raw Sewage
84", Plant Effluent 84", Plant Effluent
84", Filter Effluent 84", Filter Effluent
8, TSL 8, TSL
8, TSC 8, TSC
8, TS 8, TS
8, PW 8, PW
8, PSL 8, PSL
8, PSC 8, PSC
8, PD 8, PD
8, NPW 8, NPW
8, GTI 8, GTI
8, FESL 8, FESL
8, FESC 8, FESC
8, 8,
72, RS 72, RS
72, FI 72, FI
60, RS 60, RS
60, PO 60, PO
60, PI 60, PI
60, FO 60, FO
60", Plant Drain Return Drain 60", Plant Drain Return Drain
60", Chlorinated Effluent 60", Chlorinated Effluent
6, WW 6, WW
6, SSC 6, SSC
6, PW 6, PW
6, PSC 6, PSC
6", Primary Sludge 6", Primary Sludge
6, PD 6, PD
6, NPW 6, NPW
6, LPA 6, LPA
6, CS 6, CS
6, CBSC 6, CBSC
6, BDR 6, BDR
6", Waste Sludge 6", Waste Sludge
6", Storm Sewer 6", Storm Sewer
6", Chlorinated Effluent 6", Chlorinated Effluent
54, PB 54, PB
54, FCE 54, FCE
54", Chlorinated Effluent 54", Chlorinated Effluent
48, RS 48, RS
48, PI 48, PI
48, PE 48, PE
48, PCI 48, PCI
48, PCE 48, PCE
48, PCB 48, PCB
48, FO 48, FO
48, FEO 48, FEO
48, FEI 48, FEI
48, CBI 48, CBI
48", Mixed Liquor 48", Mixed Liquor
42, NPW 42, NPW
42", Storm Sewer 42", Storm Sewer
42", Return Activated Sludge 42", Return Activated Sludge
4, PW 4, PW
4, NPW 4, NPW
4, DR 4, DR
4, CS 4, CS
4", Storm Sewer 4", Storm Sewer
4", Plant Drain 4", Plant Drain
4", Primary Scum 4", Primary Scum
4", ES 4", ES
4", Building Drain 4", Building Drain
36, PBB 36, PBB
36, NPW 36, NPW
36, ML 36, ML
36, LPA 36, LPA
36, FEO 36, FEO
36, FEI 36, FEI
36, FCE 36, FCE
30, PD 30, PD
30, LPA 30, LPA
30", Storm Sewer 30", Storm Sewer
3, SD 3, SD
3, PD 3, PD
3, NPW 3, NPW
24, PD 24, PD
24, NPW 24, NPW
24, LPA 24, LPA
24, FER 24, FER
24, FBW 24, FBW
20, RAS 20, RAS
20, NPW 20, NPW
20", Primary Clarifier Effluenet 20", Primary Clarifier Effluenet
2.5, Potable Water 2.5, Potable Water
2, PW 2, PW
2, PS 2, PS
2, NPW 2, NPW
2, HPA 2, HPA
18, PD 18, PD
18, NPW 18, NPW
18, FER 18, FER
18", Storm Sewer 18", Storm Sewer
18", SSC 18", SSC
18", DC 18", DC
16, PD 16, PD
16, NPW 16, NPW
14, PD 14, PD
12, WS 12, WS
12, ST 12, ST
12, PD 12, PD
12, NPW 12, NPW
12, FBW 12, FBW
10, WS 10, WS
10, TS 10, TS
10, NPW 10, NPW
10, ML 10, ML
10, LPA 10, LPA
10, FER 10, FER
10", Plant Drain 10", Plant Drain
1.5, NPW 1.5, NPW
1.5, HPA 1.5, HPA
1, NPW 1, NPW
1, HPA 1, HPA
0.75, PW 0.75, PW
0.75, HPA 0.75, HPA
0, PW 0, PW
0, PD 0, PD
0, NPW 0, NPW
0, LPA 0, LPA
0, HPA 0, HPA
0, 0,
Building (5)
<all other values> <all other values>
1989 Reuse Project 1989 Reuse Project
BNR Pilot Project BNR Pilot Project
Blower Improvements Blower Improvements
Blower Project Test Holes Blower Project Test Holes
Concrete Pressure Pipe - SAR Contract 3 Concrete Pressure Pipe - SAR Contract 3
Concrete Pressure Pipe – Onion Creek Train A Concrete Pressure Pipe – Onion Creek Train A
Concrete Pressure Pipe – SAR Contract 2 Concrete Pressure Pipe – SAR Contract 2
Concrete Pressure Pipe – SAR LS Piping Concrete Pressure Pipe – SAR LS Piping
Filter Improvements Filter Improvements
Govalle Tunnel Govalle Tunnel
Lift Station 2 Lift Station 2
Misc Improvements Misc Improvements
Onion Creek Tunnel Onion Creek Tunnel
Onion Creek WWTP - Train A Onion Creek WWTP - Train A
SAR Maintenance Staff Construction SAR Maintenance Staff Construction
SAR WWTP - Train B - Contract 1 SAR WWTP - Train B - Contract 1
SAR WWTP - Train B - Contract 2 SAR WWTP - Train B - Contract 2
SAR WWTP - Train B - Contract 3 - Filter Building SAR WWTP - Train B - Contract 3 - Filter Building
SO2 Building SO2 Building
Sand Hill Energy Center Construction Sand Hill Energy Center Construction
Screw Pump Replacement Screw Pump Replacement
Substation 2 - 09 Substation 2 - 09
Thickener Improvements Thickener Improvements
Train C LS Interconnect - 04 Train C LS Interconnect - 04
Train C LS and IFS - 05 Train C LS and IFS - 05
Train C LS1 and Bar Screen - 11 Train C LS1 and Bar Screen - 11
Train C Levee - 01 Train C Levee - 01
Train C MISC - 10 Train C MISC - 10
Train C NPW - 03 Train C NPW - 03
Train C North - 07 Train C North - 07
Train C Outfall & Storm Drain - 08 Train C Outfall & Storm Drain - 08
Train C SUE Work Train C SUE Work
Train C South - 06 Train C South - 06
WWTP Security Improvements WWTP Security Improvements
ElecLightPole (7)
ElecManhole (8)
Power Station Power Station
<Null> <Null>
COMM COMM
Ground Rod Ground Rod
PULL PULL
PWR PWR
SWT SWT
TRNS TRNS
ElecConduit (9)
FieldCollection (11)
<all other values> <all other values>
 ; BUND; ELEC; FH; FTG; LTPL; MH; OE; PBOX; PIPE; POLE; ROD; STR; SWT; VLV; XFMR ; BUND; ELEC; FH; FTG; LTPL; MH; OE; PBOX; PIPE; POLE; ROD; STR; SWT; VLV; XFMR
MON MON
SUE Test Hole (12)